|
Consist in the creation of a hole with a auger which is putting out the ground at the same time is digging. Either directly in the ground or in a pipe which is pushing by jack-screws which are running whith the auger.
ADVANTAGES:
- Réactivity
- Evolutionnary material
INCONVENIENTS:
- Need of a special item to change direction.
- Relevant for diameters less than 1000.
WHAT FOR?
- Dry or wet network, under pressure or gravity.
- Concrete, Sandstone, Melting, PRV & PVC pipes.
|
.jpg)
|
SIEGE : 6, La Reynie 19130 St Aulaire Tel :05-55-17-35-01 / Fax :05-55-23-21-94
LOGISTIQUE : 2 rue jean Servanton 42000 St-Etienne Tel :04-77-74-40-72 / Fax : 04-77-74-32-57
SAS au Capital de 70 000€ * RCS 2001 B 106 * SIRET 437 892 010 0010 * APE 4312 A